Boeing is set to install newly designed engine thrust links on the 777-9 test aircraft later this summer.
These components, which play a critical role in transferring loads between the engine and wing structure, were found to have fatigue-related issues during earlier flight testing.
The updated design aims to resolve these concerns and is part of a comprehensive set of design improvements to support the aircraft certification program.
AVIATION WEEK |